Work Package 2

Specification of control and operation strategies

Work package leader: PCA

procession-period: May 2011 - April 2014


In WP 2 use case requirements for control and operation strategies for an FEV are identified and detailed. A specification and development of control and operation strategies with  respect to safety, comfort and efficiency is performed. The overall energy manager will be developed to calculate and/or coordinate the new OpEneR strategies. The  control and operation strategies development process follows the growing complexity from OpEneR Level 1 to higher OpEneR Level 2 then OpEneR Level 3.


The main objectives of WP 2 are:

  • Vehicle specification and base prototype delivery
  • Concept of system topology on vehicle level including all new subsystems packaging), Definition of metrics to quantify the  effectiveness of strategies and definition of a reference vehicleDesign, dimensioning, and simulation of vehicle concept (functional und geometric incl. specification)
  • Control and operation strategies with respect to safety, comfort and efficiency according to OpEneR Level 1, Level 2, then Level 3.
  • Overall energy manager with overall operation strategies

 

<< Work package 1                       Work package 3 >>

Deliverables for WP 2
no.

Delivery Date

Description

D 2.1

Nov. 2011

Definition of use case and requirements for Level 1 software
development >> download report  

D 2.2

Dec. 2011

Simulation to confirm final vehicle, powertrain and electrical
specification

D 2.3

July 2012

Report documenting vehicle specification, topology and simulation
results. Also running vehicle delivery.

D 2.4

April 2014

Specification and road test results of OpEneR control and
operation strategies Levels 1-3